Samsung Open Graph


Helping Samsung Save Water and Improve Operations in Texas


Insight

Precise temperature and humidity control are essential to the semiconductor fabrication process, which is why these facilities have large chiller operations. They also consume significant amounts of Ultra Pure Water (UPW) and generate substantial wastewater.

High-volume water consumption can present significant challenges in water-stressed areas such as Austin, Texas, where Samsung operates one of North America’s largest chip fabrication plants. It has 45,000 tons of chilling capacity and 34 chillers connected to two cooling towers. The challenge for this technology provider? To ensure reliable production climate control while reducing the plant’s water footprint and protecting its assets.

Samsung logo

Samsung’s Austin plant produces chips that go into mobile devices. 3D TRASAR™ Technology has helped the plant dramatically reduce its water use, control corrosion and microbial growth, and optimize its operations.

Innovation

Given its location in a water-scarce region, the Samsung facility had to increase operational reliability while optimizing water use. To support those goals, Nalco Water conducted a detailed analysis and
implemented 3D TRASAR™ Technology, addressing key areas of improvement. 

The solution benefits include:

  • Real-time notification of changing conditions
  • Detailed modeling and optimization of water sources so the facility managers could better understand the impact of improved flow management of the different streams
  • 24/7 automation to enable immediate response to scaling or corrosion
  • Technology to identify and control Key Process Indicators (KPIs) to minimize the risk of downtime or disruptions

The successful 3D TRASAR installation delivered on its promises and enabled Samsung to achieve its objectives — water reduction, corrosion and microbial control, and optimization of its operations.

eROI Icon

Annual Savings

WATER

73.8 million

gallons saved — equivalent to the annual drinking water needs of more than

255,000 people

 

$73,781

in water savings

 

$36,895

in sewer savings


ASSETS

$1.6 million

saved in reduced maintenance and equipment replacement


Total Cost Savings

$1.7

MILLION

ANNUALLY